Placer Electric, Incorporated
Placer Electric, Incorporated
  • Home
  • About Us
    • About Us
    • Our Team
    • Locations
    • Our Service
  • Safety
  • Project Highlights
    • California
    • Nevada
  • Medical Facilities
  • Contact Us
    • Home
    • About Us
      • About Us
      • Our Team
      • Locations
      • Our Service
    • Safety
    • Project Highlights
      • California
      • Nevada
    • Medical Facilities
    • Contact Us
  • Search

Hunt Wesson Substation

Placer Electric, Incorporated > Portfolios > All Highlights > Hunt Wesson Substation

PEI was the prime contractor for the installation of Hunt Wesson’s new 115 KV, 10MV substation in Davis, California. PEI was involved with Hunt Wesson’s engineering personnel and PG&E in the design and equipment selection process.

PEI provided civil engineering drawings and calculations for all concrete pads and piers. PEI also installed a 115KV pole line to intercept PG&E’s existing transmission line, saving Hunt Wesson $100,000 on the overall project.

Project Notes:

  • Control system coordination and terminations
  • Steel erection
  • Concrete forms and pouring of all pads and piers
  • Primary and secondary pole lines
  • High voltage splicing
  • Secondary line repairs

Project Information

  • Contractor: Placer Electric, Incorporated
  • Location: Davis, CA

Project Gallery

  • Sleep Train Amphitheatre
  • Feather River Tribal Health Clinic
Placer Electric, Incorporated

Placer Electric, Incorporated, is an electrical contracting firm serving Northern California and Nevada. The Company is headquartered in Sacramento and has served a varied clientele since 1978.

OUR SITEMAP

  • About
  • Safety
  • Project Highlights
  • Contact Us

Main Office

  • 5439 Stationers Way | Sacramento, California | 95842
  • (916) 338 4400
  • pei@placerelectric.com
  • Mon - Fri: 9:00a - 4:00p

© 2020 Placer Electric, Incorporated. All Rights Reserved. This website was designed by Let Me Out Productions