PEI was the prime contractor for the installation of Hunt Wesson’s new 115 KV, 10MV substation in Davis, California. PEI was involved with Hunt Wesson’s engineering personnel and PG&E in the design and equipment selection process.
PEI provided civil engineering drawings and calculations for all concrete pads and piers. PEI also installed a 115KV pole line to intercept PG&E’s existing transmission line, saving Hunt Wesson $100,000 on the overall project.
Project Notes:
- Control system coordination and terminations
- Steel erection
- Concrete forms and pouring of all pads and piers
- Primary and secondary pole lines
- High voltage splicing
- Secondary line repairs

Project Information
- Contractor: Placer Electric, Incorporated
- Location: Davis, CA