Kimmel Construction Incorporated teamed with Placer Electric for the construction of the 60,000 ft2 Feather River Tribal Health Clinic in Oroville, California.
PEI installed the complete ground-up electrical installation:
- Nurses call system
- Security system
- Fire alarm system
- Temporary power system
- 2500 amp switchgear, and
- Data cabling.

Project Information
- Contractor: Kimmel Construction Incorporated
- Location: Oroville, CA
- Surface Area (sqaure feet): 60,000 m2
- Architect: NTD Architects